This is the work that happens before anyone draws anything, and it is the stage that decides whether the rest of the project runs to plan. Most ADU cost overruns are not construction failures. They are the consequence of designing against assumptions rather than against the rules and conditions that actually apply to a specific parcel.
What Does ADU Feasibility Research Cover?
Direct answer: Feasibility establishes what your parcel legally and physically allows before design begins: the zoning district limits on size, height, lot coverage and setbacks, the easements shown on the survey, the depth to rock along the build and utility routes, and whether the wastewater system has capacity for additional bedrooms.
The Four Questions Worth Answering First
What does the zoning district allow? Size, height, lot coverage and setback limits vary by district, so a rule that applied to a friend’s project in another neighbourhood may not apply to yours. We pull the standards for your specific parcel. Our guide to setback and lot coverage rules explains how those limits interact before you see them applied to your own lot.
Where can a structure actually sit? Setbacks drawn in from the property lines, easements excluded, minimum separation from the primary residence applied. What remains is the buildable envelope, and it is sometimes much smaller than the yard suggests. Protected trees narrow it further, and building around heritage oaks covers how those ordinances treat a canopy you cannot touch.
What is under the ground? Depth to rock along both the foundation footprint and the utility route. West of the escarpment this is the single largest budget variable, and it is knowable for the cost of a few test holes.
Can the wastewater system take it? On septic, adding bedrooms increases the required design flow, and the existing system was sized for the original house. On MUD service, the district decides whether an additional connection is authorised. Those connections carry charges of their own, which ADU impact fees and utility connection costs breaks down.
What the Scope Covers
- Zoning district identification and parcel-specific limit research
- Survey review, easement mapping and buildable envelope calculation
- Coordination of geotechnical investigation and wastewater capacity assessment
- Off-street parking requirement check, particularly for garage conversions
- Neighbourhood architectural committee requirements where applicable
- Permit application, submittal package and plan review correspondence
- Inspection scheduling and coordination through final sign-off
Why the Submittal Quality Matters
Plan review is not a single event. A reviewer either approves the submittal or returns comments, and comments mean revision and re-entry into the queue. One clean submittal is dramatically faster than three rounds, and the difference is decided before anything is filed, by whether the drawings were prepared against the real requirements for that parcel.
Jurisdiction Notes
Requirements differ across the service area and have been revised in recent years in several of these jurisdictions. Two that catch people out are off-street parking, particularly on a garage conversion, and whether the finished unit can be rented short term.
[[VERIFY: verified ADU size, height, setback, lot coverage and parking requirements by jurisdiction and zoning district across the service area]]
We confirm the current standards for your parcel at the start of every project rather than working from a previous project’s assumptions.
Call (512) 690-0340 to start with a feasibility review.
Technical Specifications & Performance Standards
Materials & Tech
- • GIS Municipal Parcel Mapping Databases
- • LIDAR Property Boundary Scans
- • EnergyPro IECC Energy Calculation Reports
Performance Metrics
- • 97%+ First-Pass Municipal Permit Approval Rate
- • 30% reduction in city plan review turnaround duration
Code Standards
- • City of Round Rock Code of Ordinances Permitting Regulations
- • Williamson County Development Guidelines
Service FAQs
Why does feasibility come before design rather than after?
Because the answers change the design. A septic system that supports one additional bedroom rather than two, or a rear easement crossing the obvious build location, means drawings prepared first have to be redone. Investigation is cheap; redrawing is not.
Which authority reviews my ADU?
It depends on the parcel, not the mailing address. Round Rock, Pflugerville, Hutto and Taylor each review their own. Properties in unincorporated Williamson or Travis County go through the county, and MUD-served areas add district requirements for water and wastewater.